In
the mid 90's, a company named Zeos assembled PC's in my home state of
Minnesota. I was impressed when Zeos was named as a finalist for the
Malcolm Baldrige Award, because competing for this quality award is more
or less the equivalent of a software company trying to reach CMM Level
5. At the same time that Zeos was focusing on the Malcolm Baldrige
Award, a similar company in Austin, Texas, called Dell Computer, was
focusing all of its energy on two rather different objectives: 1) keep
inventory as low as possible, because it is the biggest risk in the PC
assembly business, and 2) deliver computers just as fast as possible
after customers decide what they want. Dell could not possibly meet
these goals unless it had the key Malcolm Baldrige capabilities in
place, but that was not its focus. On the other hand, in order to be a
finalist, Zeos had to spend huge amounts of executive and management
attention on Malcolm Baldrige activities. So which of these two
companies would you call the most mature?
A
company does not rise to the top of its industry by perfecting its
normative procedures. While General Motors was busy refining it’s four
phase process for product development, Toyota and Honda were developing
cars in something approaching half the time, for half the cost. The
resulting cars were less expensive to produce and captured a much larger
market share. Yet when looked at through Detroit’s eyes, the
development approach of the Japanese companies was decidedly immature –
why, they even let die makers start cutting dies long before the final
drawings were released!
The
problem with maturity models is that they foster a mental model of ‘good
practice’ that can block out paradigm shifts that are destined to
reshape the industry. This has happened in manufacturing. It has
happened in product development. Can it be happening in software
development today?
Why Do We Do This
To Ourselves?
We
human beings a tendency to decompose complex problems into smaller
pieces, and then focus on the individual pieces, often, unwittingly, at
the expense of the whole. One reason for this is that people can only
hold a few chunks of information in short term memory at once; Miller’s
law claims that this number is seven plus or minus two. Thus we have a
strong tendency to take concepts which we cannot get our minds around
and decompose them into parts, so we can deal with one part at a time.
There is nothing wrong with our very natural tendency to decompose
problems, except that we often forget to reconfigure the parts into a
whole and take their interactions into account.
The
problem is, decomposition only works if the whole is indeed equal to the
sum of its parts, and interactions between the parts can be ignored. In
practice, this is rarely the case; in fact, optimization of the parts
has a tendency to sub-optimize the whole. For example, a manager might
think that the best way to run a testing department is to make sure that
every single person is working all of the time. In order to guarantee
maximum productivity of each individual, he makes sure there is always a
pile of testing waiting to be done. Down the hall, the operations
manager knows better. She knows that if she runs the servers at high
utilization, the entire system bogs down, just like rush hour traffic.
If only the testing manager would realize that his policy of full
utilization of testing resources creates the same kind of traffic jam in
software development!
Decomposition of a problem into pieces is a standard problem solving
heuristic, but it needs to be accompanied by regular aggregation of the
parts into a whole. It is here that iterative development shines,
because it forces us to develop, test, integrate, and release complete
threads of the system early and often. Thus we reset our view of the
big picture every iteration. However, iterative development requires
that we decompose the problem space along dimensions that are orthogonal
to those traditionally recommended. Instead of decomposing the problem
into requirements, analysis, design, programming, testing, integration,
deployment, we decompose the problem into features along the natural
fault lines of the domain.
Decomposition vs.
Abstraction
There is an alternative to the decomposition of a problem into
components, and that is to abstract the problem to a higher level,
rather than decompose it to a lower level. The result is the same in
both cases – you have reduced the number of things you need to think
about to 7 +/- 2. But when you move the problem up to a higher level of
abstraction, the interaction of the parts is maintained, so abstractions
would seem to be the better approach to solving complex problems.
There is a catch: people can’t create abstractions without
understanding the domain, because correct abstractions require that the
abstractor knows what is important, what fits together naturally, and
where to find the natural joints or fault lines or the domain. For this
reason, experts in the domain have a greater tendency to abstract to a
higher level, while those who are not familiar with the domain tend to
decompose the problem, and that decomposition will probably not be along
the natural fault lines of the domain.
It
is when we decompose a problem in a manner which does not fit the
domain, and then drill down to the details too fast, that important
things get missed. We would like to think that a lot of early detail
will help us find all the hidden gremlins that might bite us later.
This is only true if those gremlins are actually inside the areas we
investigate – but the tough problems usually lurk between the cracks in
our thinking. Unfortunately we only discover those problems when we
integrate the pieces together at the end, and by that time we have
invested so much in the details that change is very difficult.
It
is safer to work from a higher level or abstraction, but this means we
don’t drill down to detail right away. We take a breadth-first
approach, keep options open and gradually fill in the details. With
this approach we are more likely to find those gremlins while we still
can do something about them, but some people might think that we don’t
have a plan, aren’t tracking the project, and can’t manage requirements.
Assessment Rather
than Certification
Quite frequently CMM is implemented as a certification process,
decomposing ‘mature’ into separately verifiable capabilities. The
danger is that we may lose sight of forest for the trees. For example,
focusing on requirements management can be detrimental to giving users
what they really want. Focusing on quality assurance separate from
development can destroy the integrating effect of developers and testers
working side-by-side every day. Focusing on planning as a predictive
process can keep us from using planning as an organizing process.
A
better approach to discovering the underlying competence of an
organization is to use an assessment process rather than a certification
process. Assessments present challenging situations that cannot be
dealt with unless a host of capabilities are in place; if the challenge
is properly handled, the presence of these capabilities can be
inferred. For example, a pilot’s ability to fly a plane can be assessed
by observing how the pilot lands a plane in a stiff cross wind.
Consider your hiring process. When a candidate lists Microsoft or PMI
certifications, you take that into account, but you are really looking
for a track record of success which demonstrates that the certifications
were put to good use. One software company I know administers a one
hour logic tests to job applicants, a test without a line of code in
it. Yet the test does an admirable job of assessing the capability of
the candidate to think like a good developer.
Measure UP
If
we accept that we get what we measure then, as Rob Austin points out in
“Measuring and Managing Performance in Organizations,” we do not get
what we don’t measure. If we are not measuring everything, if something
important just didn’t make it into our measurement system, then we are
not going to get it. To counter this problem, we have a tendency to
pile one measurement on top of another, every time we discover that we
forgot to measure something. In CMM, for example, each KPA addresses
something that caused a failure of some software project somewhere. As
people discovered new ways for software projects to fail, a KPA’s was
added to address the new failure mode. Nevertheless, all of those KPA’s
still don’t cover everything that could go wrong, although they
certainly try.
Once
we admit that we just can’t measure everything, then we are ready to
move to assessment-style measurements rather than a certification-style
measurements. For example, in project management, we decompose the
measurement system into cost, schedule, scope and defects, and we try
hard to make these measurements work because we think they are the
measurements we should use. But no matter how hard we try, we are often
unsuccessful in measuring true business value by totaling up the
yardsticks of cost, schedule, scope and defects.
What
if we just measured business value instead of cost, schedule, scope, and
defects? When I was developing new products at 3M, we did not pay much
attention to cost, schedule and scope. Instead we developed
a P&L which we would use to check out the impact of a late introduction
date or a lower unit cost. The development team tried to optimize
the overall P&L, not any one dimension. It may seem strange that a
project team would concern itself with the financial model of the
business, but I assure you it is far better decision-support tool than
cost, schedule and scope.
The Measure of
Maturity
I
believe that our industry could use a simpler measurement of software
development maturity, one that is not subject to the dangers of
decomposition and does not attempt to defy Miller’s Law with a long lists
of things to think about. I propose that we use a measurement that has
been successfully used in countless organizations, and has proven
to be a true indicator of the presence of the kind of capabilities
measured by CMM. To introduce this measurement, let’s go back to Dell
and see what it measured:
1)
The level of inventory throughout the entire system, and
2)
The speed with which the organization can repeatedly and reliably
respond to a customer request.
Okay, you say, fine for manufacturing, but software development is
different.
True, I counter, but these measurements still work.
The
level of inventory in your system is the amount of stuff you have under
development. The more inventory of unfinished development work you have
sitting around, the more you are at risk of it growing obsolete, getting
lost, and hiding defects. If you capitalized it, you also bear the risk
of having to write it off if it doesn’t work. The less of that kind of
stuff you have on hand, the better off you will be.
The
speed with which you can responds to a customer is directly proportional
to the amount of unfinished development work you have clogging up your
system. In truth, the two measurements above are one and the same – you
can deliver faster if your system is not clogged with unfinished work.
But more to the point, you cannot reliably and repeatedly deliver fast
if you do not have a mature organization. You need version control,
built-in quality, ways to gather requirements fast and routinely
translate them correctly into code. You need everything you measure in
CMM, and you need all of those capabilities working together as an
integrated whole. In short, the speed with which you can repeatedly and
reliably deliver on customers requests is a better measure of the
maturity of your software development organization.